GDV Utilities
Malibu, CA · Los Angeles County

Temporary power poles
in Malibu.

GDV Utilities installs temporary power poles for new homes, ADUs, remodels and commercial sites in Malibu, and upgrades panels for solar and EV chargers. We pull the permit, handle the SCE service request and meet the inspector.

Serving utilitySCE
Temp panel sizes100A or 200A
Turnaround3–5 business days after permit and utility approval
LicensedCalifornia license A & C-10 #1163710
Malibu temporary power

How it works in Malibu

One call covers the permit, the utility, installation, inspection and removal.

1. Permit

We pull the electrical permit with the City of Malibu building safety division and schedule the inspection.

2. Utility service request

Southern California Edison (SCE) serves Malibu along the coast and in the canyons. We submit the request, and the SCE planner sets the pole location.

3. Install, inspect, energize

We set and wire the pole with a 100A or 200A panel, meet the inspector, and the utility sets the meter and energizes.

Local note: Much of the Malibu work right now is fire rebuild along Pacific Coast Highway and in the canyons. Lots are often steep, narrow or right on PCH, so we plan the pole around access, slopes and traffic control, and we coordinate with SCE through its rebuild process. See our fire rebuild resources for SCE and Malibu rebuild links.
Panel & service upgrades

Solar & EV panel upgrades in Malibu

Main panel and service upgrades sized for solar, battery storage and EV chargers, including trenching.

Load review

We check your existing panel and service against your solar, battery or EV plans and size the upgrade correctly.

Panel and service upgrade

New main panel or meter main, service conductors and trenching for underground runs and charger feeds.

Utility coordination

We schedule the disconnect and reconnect with SCE and handle the paperwork start to finish.

Neighborhoods

Where we work in and around Malibu

Plus nearby communities across Los Angeles County.

Point DumeBig RockLas Flores CanyonCarbon BeachMalibu WestSerra RetreatCorral CanyonMalibu ParkZumaTopanga
Comparing quotes?

Why our quote looks different

A low temporary power quote often covers the pole and little else. Ours covers the whole job, from permit to removal.

Included in a GDV Utilities quote

  • Electrical permit pulled for you
  • Utility service request and planner coordination
  • Pole, meter base and 100A or 200A panel, installed
  • Inspection scheduled and attended
  • Removal when permanent power is on
  • Rental or purchase option
  • Licensed: CA A & C-10 #1163710, bonded and insured

Often extra or left out of low quotes

  • Permit left to the builder
  • “Customer to coordinate with utility”
  • Panel or meter base sold separately
  • Trip charges when an inspection fails
  • Removal billed later, at a new price
  • One option only
  • Unlicensed or handyman installs

Have another quote? Send it with your request and we’ll show you, line by line, what each one includes.

FAQ

Malibu temporary power questions

Which utility serves my job site in Malibu?

Southern California Edison (SCE) serves Malibu along the coast and in the canyons. We confirm the serving utility for your address before we quote.

Who pulls the permit for a temporary power pole in Malibu?

We do. GDV Utilities pulls the electrical permit with the City of Malibu building safety division, submits the utility service request and meets the inspector. Permit fees are priced separately after the job is signed.

How fast can you install a temporary power pole?

Typically 3 to 5 business days after the permit is issued and the utility approves the service location. The utility schedules the meter set and energization.

What size temporary panel do I need?

Most single-family homes and ADUs use a 100A or 200A temporary panel. We size it to your tools, trailers and site loads when we quote.

Can I rent or buy the temporary power pole?

Both. We can quote a rental or a purchase option for your temporary power pole, so you can choose what fits the length of your project.

Do you do solar and EV panel upgrades in Malibu?

Yes. We upgrade main panels and services for solar, batteries and EV chargers, including trenching, and coordinate the disconnect and reconnect with SCE. GDV Utilities holds California license A & C-10 #1163710.

Contact

Need power on a Malibu job?

Send the job address and a photo showing the nearest utility pole. We reply within one business day.

Free: Fire Rebuild Power Guide
LADWP vs. SCE steps for Palisades and Altadena lots, plus underground service planning.
Get the guide