GDV Utilities
Los Angeles County

Temporary power poles
& panel upgrades in Los Angeles & San Fernando Valley.

GDV Utilities installs temporary power poles for construction sites and upgrades electrical panels for solar and EV chargers across Los Angeles and the San Fernando Valley. We handle the permit, the utility and the inspection.

Building inside LA city limits? See temporary power poles in Los Angeles for the LADBS permit and LADWP steps.
Utilities we work withLADWP, SCE, Burbank Water & Power, Glendale Water & Power, Pasadena Water & Power
Temp panel sizes100A or 200A
Turnaround3–5 business days after permit and utility location approval
LicensedCalifornia license A & C-10 #1163710
Temporary power poles

Construction power in Los Angeles & San Fernando Valley

For new homes, ADUs, remodels and commercial sites. One call covers the permit, utility request, installation, inspection and removal.

Permit with the local building department

We pull the electrical permit with the city or county building department (for example, LADBS in the City of Los Angeles or LA County Building & Safety) and schedule the inspection.

Utility service request

LADWP serves the City of Los Angeles, including the San Fernando Valley, while SCE serves much of the rest of Los Angeles County, and Burbank, Glendale and Pasadena run their own municipal utilities. We submit the service request and work with the utility planner, who sets the pole location.

Installed and inspected

We set and wire the pole with a 100A or 200A panel, meet the inspector, and the utility sets the meter and energizes.

Panel & service upgrades

Solar & EV panel upgrades

Main panel and service upgrades sized for solar, battery storage and EV chargers, including trenching, start to finish.

Load review

We check your existing panel and service against your solar, battery or EV plans and size the upgrade correctly.

Panel and service upgrade

New main panel or meter main, service conductors and trenching for underground runs and charger feeds.

Utility coordination

We work with your serving utility on the service request and schedule around the disconnect and reconnect the utility performs.

Service area

Cities we serve

Plus surrounding communities. Don't see your city? Call us, we likely cover it.

Utilities
LADWP logo
SCE logo
Burbank Water & Power logo
Glendale Water & Power logo
Pasadena Water & Power logoPasadena Water & Power
Comparing quotes?

Why our quote looks different

A low temporary power quote often covers the pole and little else. Ours covers the whole job, from permit to removal.

Included in a GDV Utilities quote

  • Electrical permit pulled for you
  • Utility service request and planner coordination
  • Pole, meter base and 100A or 200A panel, installed
  • Inspection scheduled and attended
  • Removal when permanent power is on
  • Rental or purchase option
  • Licensed: CA A & C-10 #1163710, bonded and insured

Often extra or left out of low quotes

  • Permit left to the builder
  • “Customer to coordinate with utility”
  • Panel or meter base sold separately
  • Trip charges when an inspection fails
  • Removal billed later, at a new price
  • One option only
  • Unlicensed or handyman installs

Have another quote? Send it with your request and we’ll show you, line by line, what each one includes.

FAQ

Common questions

Who decides where the temporary power pole goes in Los Angeles and the San Fernando Valley?

The serving utility's planner sets the service location. LADWP serves the City of Los Angeles, including the San Fernando Valley, while SCE serves much of the rest of Los Angeles County, and Burbank, Glendale and Pasadena run their own municipal utilities. We submit the service request, then install the pole where the utility approves.

Do you pull the permit and schedule the inspection?

Yes. We pull the electrical permit with the city or county building department (for example, LADBS in the City of Los Angeles or LA County Building & Safety), handle the utility service request, install the pole and meet the inspector. Permit fees are not included in our quote; they are priced separately after the job is signed.

How fast can you install a temporary power pole?

Installation is typically 3 to 5 business days after the permit is issued and the utility approves the service location. Meter installation and energization are scheduled by the utility.

Do you remove the pole when the job is done?

Yes. We remove the pole once your permanent service is on. We can quote a rental or a purchase option for your temporary power pole, so you can choose what fits the length of your project.

Do you do panel upgrades for solar and EV chargers in Los Angeles and the San Fernando Valley?

Yes. We upgrade main panels and services for solar, battery storage and EV chargers, including trenching, and coordinate with the utility from service request to reconnection. GDV Utilities holds California license A & C-10 #1163710.

Contact

Ready for a quote?

Send us your job site or property details and we'll get back to you within one business day.

Free: Temp Power Checklist
Permit to energize in six steps, plus who serves your lot and what causes delays.
Get the checklist